Lifecycle Stage: TEST
Weave your sampling and lab execution activities into your manufacturing system to embed Quality-By-Design throughout execution to optimize quality
The Test Stage incorporates:
Batch sampling
Product quality testing
Lab activity modernization and process interconnection
Test Stage use cases
Test Stage: USE CASE #1
Sample Testing
Digitize methods, assays and test samples to ensure manufacturing, lab, material and product quality.
Develop and execute test methods without any code. With one shared system between quality control and manufacturing operations, never slow down the process waiting to share data back and forth.
$
R.O.I.
First-year savings for a site of 25 operators:*
Small molecule
$153,770
$153,770
Large molecule
$215,278
$215,278
Test Stage: USE CASE #2
Plate Management
Manage complex plates to ensure sample to well traceability.
Generate samples with ease by scanning them in on a mobile app. With point and click assay assignment, manage complex plates and track them throughout the process to ensure comprehensive traceability.
$
R.O.I.
First-year savings for a site of 25 operators:*
Small molecule
$90,310
$90,310
Large molecule
$126,433
$126,433
Test Stage: USE CASE #3
Reagent and Instrument Management
Automate calibration and reagent traceability to ensure assay robustness.
Efficiently monitor instrument status, track reagent origins and batches, and maintain a consistent quality standard, guaranteeing the reliability and precision of every assay conducted.
Automate the calibration of instruments and tracing reagents to uphold the robustness of assays, plates, and samples.
In a lab, lab technicians and quality control specialists work hand-in-hand to ensure instruments are accurately calibrated and that reagents are traceable throughout their usage lifecycle.
$
R.O.I.
First-year savings for a site of 25 operators:*
Small molecule
$275,810
$275,810
Large molecule
$386,134
$386,134
*ROI calculation assumptions — Small Molecule: Number of batch runs = 500; Payroll burden = 50%; Tech transfers to other sites using Tempo: 1. Large Molecule: Number of batch runs = 50; Payroll burden = 50%; Tech transfers to other sites using Tempo: 3.